Solid Lines
@solidlines.arch
solidlinesdesignco@gmail.com
0917 392 3269
Joyce Brito
Architecture  |  Interiors  |  Plumbing & Sanitary |  Site Planning
Main Welcome Logo

Regular Design Services

  • Detailed Architectural Design Services
  • Detailed Architectural and Engineering Design Services
  • Detailed Plumbing and Sanitary Design Services

Specialized Arch'l Design Services

  • Detailed Architectural Interior Design Services
  • Detailed Site Development Planning Design Services

Outsourcing Services

  • CAD / BIM Drawing Production
  • 3D Modelling, Visualization, and Walkthrough
  • Photo Manipulation and Post-processing
Discovery Icon

Discovery

Project Definition Phase

Series of consultations and site meetings where data gathering takes place, and then turning the information into a space program.

Diagnosis Icon

Diagnosis

Schematic Design Phase

Evaluation of the owner’s requirements, budget, schedule that is translated into preliminary layout as basis of the initial cost estimates.

Detailing

Design Development Phase

Refinement of the sketches where initial utility diagrams, material specifications, more detailed drawings and cost estimates are prepared.

Documentation

Contract Documentation Phase

Production of necessary documents, such as complete drawing package of all trades, specifications, computational analysis reports, and bill of materials for bidding reference and building permit application.

Delivery

Construction Phase and Project Turnover

Awarding of the project to the contractor, plus occasional site visits and meetings during construction to ensure the quality of workmanship and compliance tothe drawings/specifications and change orders.

RC Office Fit-out

2017 | Calamba city, Laguna
Proposal

RC Office Fit-out

2017 | Calamba city, Laguna
Proposal

S Residence

2018 | Bacolod City, Negros Occidental
Approved for Construction

BB Private Resort

2018 | Los Baños, Laguna
Approved for Construction

BB Private Resort

2018 | Los Baños, Laguna
Approved for Construction

M Residence Extension

2018 | San Pedro City, Laguna
Approved for Construction

J Residence

2018 | Calamba City, Laguna
Approved for Construction

F Mixed-Use Building

2019 | San Pedro City, Laguna
Approved for Construction

B Duplex Apartment

2019 | San Pedro City, Laguna
Approved for Construction

C Mixed-Use
Commercial Building

2019 | San Pedro City, Laguna
Approved for Construction

SE Dry Dock

2020 | Pitogo, Quezon
Proposal

SE Dry Dock

2020 | Pitogo, Quezon
Proposal

B Residence Facelift

2020 | Sta. Rosa City, Laguna
Proposal

J Mixed-Use Building Facelift

2021 | Candaba, Pampanga
Schematic Design

J Mixed-Use Interiors

2021 | Candaba, Pampanga
Schematic Design

J Mixed-Use Interiors

2021 | Candaba, Pampanga
Schematic Design

J Mixed-Use Interiors

2021 | Candaba, Pampanga
Schematic Design

J Mixed-Use Interiors

2021 | Candaba, Pampanga
Schematic Design

Say Hello!

Your Name
Your Email Address
Your Message
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Submit